Melbourne 平均房价House 价格比去年下降9% . 周边地区Albert Park | $2,082,700 ![](/img/down.gif) | Carlton | $1,450,200 ![](/img/up.gif) | Cremorne | $1,323,300 ![](/img/down.gif) | Docklands | $1,585,800 ![](/img/up.gif) | East Melbourne | $3,315,000 ![](/img/up.gif) | North Melbourne | $1,273,500 ![](/img/down.gif) | Parkville | $1,704,000 ![](/img/down.gif) | Prahran | $1,613,500 ![](/img/down.gif) | Richmond | $1,426,700 ![](/img/up.gif) | South Melbourne | $1,609,000 ![](/img/down.gif) | South Yarra | $1,702,600 ![](/img/down.gif) | Southbank | $885,300 ![](/img/white.gif) | St Kilda | $1,522,800 ![](/img/down.gif) | West Melbourne | $1,356,200 ![](/img/down.gif) | Windsor | $1,477,800 ![](/img/down.gif) | Melbourne Median RentThe House rent is 上升5% .
| A2 Bowen Crescent, Melbourne | 距离: | 3 公里 to CBD; 693 米 to Wright Station [公共交通] |
|
| ![](http://cbk0.google.com/cbk?output=thumbnail&w=160&h=130&ll=-37.84066108,144.95655337) 邻居照片 |
地图位置 | 街景 | 周边成交价 | 改建申请历史: | | 2002年05月09日 | Buildings and works comprising the erection of a canopy structure over the existing outdoor seating area and new pedestrian access arrangements. | (Source: Port Phillip Council, 申请编号: 539/2002) | | 2004年02月26日 | The buildings and works comprising the erection of a glazed canopy structure, screens and other minor alteration works to the exsting outdoor Cafe seating area. | (Source: Port Phillip Council, 申请编号: 209/2004) | | 2008年06月17日 | construct a rear vehicular access from Bowen Lane to the car park by partial removal of the existing facade and the installation of vehicular crossing and automated roller door | (Source: Port Phillip Council, 申请编号: 645/2008) | | 2015年12月02日 | Construction of a mixed use building comprising retail at the ground floor and 214 apartments above, over two levels of basement car parking | (Source: Port Phillip Council, 申请编号: 1293/2015) | | 2019年08月17日 | Development and use of a 19 storey building above three basement levels for the purpose of dwellings and retail with a reduction in the car parking requirements and waiver of the loading bay requirements Amended to allow the following: - Amending end | (Source: , 申请编号: ) |
| | |