Malvern East 平均房價House 價格比去年上升7% . 周邊地區Ashburton | $1,956,300 | Ashwood | $1,507,300 | Carnegie | $1,514,300 | Caulfield North | $1,772,300 | Chadstone | $1,276,000 | Glen Iris | $1,991,300 | Hughesdale | $1,365,500 | Malvern | $2,083,600 | Murrumbeena | $1,516,000 | Oakleigh | $1,452,100 | Malvern East Median RentThe House rent is 上升14% .
| X"2/5 Peak Street, Malvern East" 附近的改建 |
| 27 Aug 2019 | Installation and display of an internally illuminated sign in a Road Zone Category 1 and a Heritage Overlay |
|
| 01 Apr 2020 | Display of internally illuminated signage on an existing tram shelter |
|
| 01 Apr 2020 | Display of internally illuminated signage on an existing tram shelter |
|
| 19 Feb 2014 | Amendment to approved Planning Permit and/or Plans - full demolition and facade reconstruction | 16 Jul 2014 | Amendment to approved Planning Permit and/or Plans - Provide a second bedroom/study, solar access and ventilation and improve layout | 24 Aug 2018 | S72 Amendment to approved Planning Permit and/or Plans - alterations to expiry dates under condition 17 |
|
| 20 Jan 2009 | Partial demolition of the existing buildings and subsequent buildings and works to provide shops and student accommodation, with associated car parking dispensation in a Business 2 zone and a Heritage Overlay. Cost $990,000. Status: Refused | 09 Oct 2009 | Demolition, Buildings & works, waiver of car parking and use of land for shops and dwellings on a site zoned Business 2 and affected by a Heritage Overlay. Cost $750,000. Status: NOD | 07 Dec 2010 | S72 Amendment to approved Planning Permit and Plans for changes to permit conditions regarding floor levels of the first floor, the amount of demolition to the building, retention of the existing awning and to allow for the construction of a plant ar | 19 Feb 2014 | S72 Amendment to approved Planning Permit and Plans - Changes to allow for full demolition and reconstruction / reinstatement of shopfronts. Status: Issued | 16 Jul 2014 | Secondary Consent Amendment to approved Plans to modify internal layout to add a second bedroom with changes to roof to allow for solar access and ventilation. Status: Issued |
|
| 29 Nov 2011 | Construction of a multi-dwelling development in a Residential 1 Zone |
|
| 10 Jul 2008 | Multi unit development. Cost $1,200,000. Status: Failure | 05 Feb 2010 | Construction of a multi dwelling development on a lot within a Residential 1 Zone. Cost $1,400,000. Status: Failure | 29 Nov 2011 | Construction of a multi-dwelling development in a Residential 1 Zone. Cost $1,500,000. Status: Withdrawn |
|
| 26 Aug 2014 | Secondary Consent Amendment to approved plans - Modification to the mix of dwelling types, increase in the number of tandem car parking spaces, increase in size and modification to shop area, design of building amended, levels altered, internal alter | 29 Mar 2018 | Amendment to approved Planning Permit and/or Plans |
|
| 05 Dec 2012 | Use and development of the land for dwellings and shops in a Commercial 1 Zone, reduction in the car parking requirement, alter access to a Road Zone 1 and the erection of two (2) electronic major promotion signs. Cost $70,000,000. Status: Failure | 04 Mar 2015 | Secondary Consent Amendment to approved plans - Relocate the two electronic signs, deletion of one, two bedroom dwelling and minor external alterations |
|
| 20 Aug 2013 | Temporary advertising signage on a lot within a Commercial 1 Zone. Cost $9,000. Status: Issued |
|
| | |