Perth 平均房價House 價格比去年上升1% . 周邊地區Perth Median RentThe House rent is 上升8% .
| X"82/418 Murray Street, Perth" 附近的改建 |
| 01 May 2013 | New two storey building and one storey addition to existing retail building - Zara | 11 Jun 2013 | Demolition of Shop Ground Floor | 28 Aug 2013 | New Two-Storey Building at Ground Level on Lot 223-225 Extending Over an Existing Single-Storey Building Located. Cost: $6248000 | 19 Sep 2013 | Hoarding - 8 Months | 04 Oct 2013 | Hoarding - 7 Months | 24 Feb 2014 | Smoke Exhaust System - Zara Development | 15 Apr 2014 | 12 x Signs - Zara | 15 May 2014 | Amendment to Design of Smoke Detection System - Zara Development | 04 Jun 2014 | Retail Fitout Ground & First Floor - Zara. Cost: $7125300 | 17 Sep 2014 | Hoarding - 1 Month | 03 Oct 2014 | Retail Fitout Ground & First Floor - Zara |
|
| 24 Jun 2014 | Install Canopy Level 2 - Zara Development. Cost: $110000 | 03 Jul 2014 | Installation of a replacement awning. Cost: $110000 | 06 Nov 2014 | Installation of Additional Storage Areas - Zara. Cost: $26370 | 17 Jun 2015 | New signage x 2 \ |
|
| 24 Aug 2012 | 3 x Non-Illuminated Signs - \ | 17 Sep 2014 | Retail Tenancy Fitout - Vodafone. Cost: $198000 | 15 Dec 2014 | Retail Tenancy Fitout - Vodafone | 25 Feb 2015 | New Signage Blade & Applied Frosted Vinyl to Existing Retail Shopfront - Vodafone. Cost: $49610 | 17 Apr 2015 | 1 x Sign - Vodafone |
|
| 14 Feb 2013 | Internal Demolition of Ground Floor | 13 Jun 2013 | Internal Fitout, New Shopfront and Awning Reclad | 19 Jun 2013 | Retail Fitout - Tony Barlow | 20 Jun 2013 | Hoarding 1 month | 16 Jul 2013 | Scaffolding 1 month - Perth Aluminium Scaffolds $0 |
|
| 15 May 2013 | Sign and Alterations to Shopfront - Portmans | 15 May 2013 | 3 x Signs - Portmans $0 | 15 Jul 2013 | Retail Fitout - Portmans |
|
| 02 Nov 2012 | Hoarding 8 Weeks - Lovisa $0 | 30 Jan 2013 | Retail Fitout - Lovisa |
|
| 26 Jun 2013 | Refurbishment of Retail and Facade/Almalgamation of Carillian City. Cost: $8000000 | 30 Jul 2013 | Change of Use to Consultation Rooms Shop 65 - Life Ready Physio. Cost: $50000 | 24 Sep 2013 | Demolition of a Portion of Ground (Murray St Level) and Upper (Hay St Level) Level Walkway. Cost: $325752 | 19 Mar 2014 | Removal & Replacement of Escalators Refurbishing Floor Coverings Column Coverings & Balustrading. Cost: $440000 | 27 May 2014 | Change of Use Shop Fitout Shopfront Alterations & Signage Shop 31 - Hype DC. Cost: $300000 | 25 Jul 2014 | Revised Works for Amalgamation of Tenancies Stage 1 - Top Shop Top Man | 24 Nov 2015 | Replacement of Signs with New Signage for 'Topshop Topman'. Cost: $4550 | 15 Jan 2016 | Replacement of Signs with New Signage for 'Topshop Topman' |
|
| 30 Jan 2013 | Office Fitout and Tenancy Separation Levels 11, 12 & 13 - NAB. Cost: $289262 | 21 Jun 2013 | Installation of Suspended Ceiling, Alterations to Fire Sprinklers and Air Conditioning. Cost: $50000 | 15 Jan 2016 | INPEX - Minor Fitout/Refurbishment Works to Level 17 | 05 May 2016 | Replacement of 2 x ATM's & Part Replacement of External & Internal Cladding Finish to around the ATM's - NAB. Cost: $35000 |
|
| 03 Apr 2014 | DAP/14/005222014/5098The Melbourne Hotel Redevelopment942-950 Hay & 33 Milligan Streets, Perth |
|
| 28 May 2015 | Proposed Alterations and Additions to Existing Grouped Dwelling | | 距離: 12426.1 公里 | 地圖位置 | 街景 |
|
| | |