Beaumaris 平均房價House 價格比去年上升4% . 周邊地區Beaumaris Median RentThe House rent is 上升12% .
| X"3 Armstrong Street, Beaumaris" 附近的改建 |
| 19 Dec 2005 | Alterations to Dwelling. Cost $51,598 | 25 Jun 2008 | Construction of Swimming Pool. Cost $48,000 | | 距離: 98 米 | 地圖位置 | 街景 |
|
| 09 Sep 2011 | Additions and Alterations to Dwelling | | 距離: 101 米 | 地圖位置 | 街景 |
|
| 28 Sep 2007 | Construction of Swimming Pool. Cost $10,000 | 10 Feb 2009 | Additions and Alterations to Dwelling. Cost $17,975 | | 距離: 129 米 | 地圖位置 | 街景 |
|
| 29 Jun 2007 | 1 Dwelling - Alts & Adds on Lot < 500m2 Alterations and additions to an existing dwelling on a lot less than 500 square metres. Cost $81,695 | 03 Sep 2007 | Alterations to Dwelling. Cost $90,000 | 27 Nov 2009 | Fence on a Lot < 500m2 Construction of a front fence on a lot less than 500 square metres. Cost $9,540 | 04 May 2010 | Construction of Fence. Cost $9,540 | | 距離: 110 米 | 地圖位置 | 街景 |
|
| 18 Dec 1997 | Construction of Carport | 25 Nov 2003 | Additions to Dwelling | | 距離: 164 米 | 地圖位置 | 街景 |
|
| 23 Oct 2014 | Demolition of Dwelling, Garage and Outbuilding | 09 Feb 2015 | Construction of Swimming Pool and Swimming Pool Barrier. Cost $41,000 | 10 Feb 2015 | Construction of Dwelling and Garage. Cost $608,019 | 02 Sep 2015 | Construction of Fence. Cost $13,739 | 15 Sep 2015 | VPO3 - Removal x 1 Removal of One (1) Native Tree in a Vegetation Protection Overlay. Cost $0,600 | | 距離: 130 米 | 地圖位置 | 街景 |
|
| 13 Jul 2015 | Construction of Verandah to Dwelling. Cost $5,000 | | 距離: 118 米 | 地圖位置 | 街景 |
|
| 14 Oct 2013 | VPO3 - Removal x 2 Removal of two trees in a Vegetation Protection Overlay 3 | 29 Oct 2013 | Additions & Alterations to Dwelling - Internal Alterations. Cost $1,650 | | 距離: 164 米 | 地圖位置 | 街景 |
|
| 29 Sep 2005 | VPO3 - Removal x 1 Removal of native vegetation in a VPO3 overlay | | 距離: 162 米 | 地圖位置 | 街景 |
|
| 28 Jul 2003 | Additions and Alterations to church | 05 Aug 2003 | Subdivision of Land (1 to 9 Lots) Two (2) lot subdivision | 09 Oct 2009 | Advertising Signs Business Identification Signage in a Road Zone Category 1. Cost $6,000 | 21 May 2012 | VPO3 - Removal x 1 Removal of one (1) tree in a Vegetation Protection Overlay 3 | | 距離: 112 米 | 地圖位置 | 街景 |
|
| | |