09 Aug 1990 |
Provide a new roof line over the entrance on the western wall to be in keeping with the existing roof line in terms of pitch and materials. |
30 Nov 1990 |
Erecting a fence to the perimetre of the school toElizabeth Sinclair and Snadham Streets. Also proposed changes to the carpark layout . |
03 Dec 1993 |
Proposal is to extend the Principal's Office and Library at ground floor by extending to in line with the classroom walls. |
24 Aug 2001 |
Ground first floor extension to existing Primary School classroom and music rehersal rooms. |
21 Dec 2001 |
Demolition of a Brick Toilet Block |
12 Nov 2004 |
Construction of alterations and additions to the existing primary school and kindergarten (including a single-storey classroom building at the rear of the site) |
17 Aug 2006 |
Partial demolition of existing building and construction of two storey building |
17 Aug 2006 |
Construction and alterations of a single storey addition (link between school and kindergarten building), associated car parking of the existing primary school and kindergarten. |
24 Aug 2007 |
Partial demolition and construction of alterations and additions to the existing portable classroom and shade structure associated with the existing primary school and kindergarten use on land within a Heritage Overlay area |
16 Sep 2008 |
Construct and carry out works on land within a Heritage Overlay area |
27 Nov 2008 |
Construction and alterations of a single storey addition (link between school and kindergarten building), associated car parking of the existing primary school and kindergarten. |
27 Nov 2008 |
Buildings and works for the construction of a single storey addition (link between the existing primary school building and the existing kindergarten building), alterations to the kindergarten, administration and multi-purpose buildings, and associat |
21 Sep 2009 |
Use of the land for a Primary School and Kindergarten and alterations to convert an existing primary school classroom to a kindergarten room |
05 Nov 2009 |
To amend permit as follows: alteration to condition 10 to allow the number of kindergarten students to increase from 90 to 116 |
20 Aug 2010 |
Demolition of existing fencing and construction of fencing to the perimeter of the site on land affected by the Heritage Overlay |
01 Nov 2010 |
Demolition of existing fencing and construction of fencing to the perimeter of the site on land affected by the Heritage Overlay |
01 Aug 2011 |
Voluntary amendments to approved fence/gates |
10 Aug 2012 |
Construction of an entry guard house and associated canopy to existing school on land within a Heritage Overlay area |
22 Jan 2013 |
Construction of works for a non-domestic disabled access ramp on land affected by the Heritage Overlay |
29 Apr 2013 |
Partial demolition and construction of buildings and works (disabled lift, foyer & upgrade to WC) associated with the existing school on land within a Heritage Overlay |
09 May 2014 |
Construction of fencing to an existing education facility on land affected by a Heritage Overlay |
22 May 2014 |
External alterations to an existing building |
23 Dec 2015 |
Partial demolition with construction of alterations and additions and associated vegetation removal. |
01 Feb 2016 |
Partial demolition with construction of alterations and additions and associated vegetation removal |
|
距離: 41 米 |
地圖位置 | 街景 |