Glen Iris 平均房價House 價格比去年上升2% . 周邊地區Ashburton | $1,976,000 ![](/img/up.gif) | Ashwood | $1,509,000 ![](/img/up.gif) | Burwood | $1,433,300 ![](/img/up.gif) | Camberwell | $2,288,700 ![](/img/up.gif) | Hawthorn East | $2,266,400 ![](/img/up.gif) | Malvern | $2,251,400 ![](/img/down.gif) | Malvern East | $1,841,200 ![](/img/white.gif) | Glen Iris Median RentThe House rent is 上升16% .
| X"4/1421 High Street, Glen Iris" 附近的改建 |
| 10 Jul 2014 | Buildings and works in a Special Building Overlay and to construct and display an illuminated business identification sign in a General Residential Zone. Status: Withdrawn | 21 Nov 2014 | Buildings and works to construct a building (for use as a medical centre, permit not required) in a Special Building Overlay. Cost $450,000. Status: Issued | | 距離: 107 米 | 地圖位置 | 街景 |
|
| 26 Mar 2008 | 10 Lot Subdivision. Status: Issued | | 距離: 116 米 | 地圖位置 | 街景 |
|
| 05 Nov 2017 | Proposed two storey duplex | | 距離: 139 米 | 地圖位置 | 街景 |
|
| 10 Sep 2007 | New dwelling on a lot under 500sqm. Status: Issued | | 距離: 157 米 | 地圖位置 | 街景 |
|
| 08 May 2019 | Secondary Consent Amendment to approved plans - Replace the 2 water tanks with 1 single size >=5000L tank. Remove west window on 2nd floor and replace with a smaller window to the south wall. Reduce size of Kitchen and Cooking windows. | | 距離: 233 米 | 地圖位置 | 街景 |
|
| 17 Jun 2014 | Construction of a multi-dwelling development in a General Residential Zone and Special Building Overlay and associated reduction in the car parking requirements. Cost $6,000,000. Status: NOD | 24 Jun 2015 | Amendment to approved Planning Permit and/or Plans - Removal of Condition 1(a) 'Reduction in the number of apartments to 21' and various modifications | | 距離: 175 米 | 地圖位置 | 街景 |
|
| 04 Apr 2011 | Eight (8) Lot Subdivison & Common Property - PS 647171 N. Status: Issued | | 距離: 168 米 | 地圖位置 | 街景 |
|
| 16 Mar 2019 | Proposed 1.8 metre high timber front fence. | | 距離: 173 米 | 地圖位置 | 街景 |
|
| 02 Aug 2012 | Extension of a dwelling on a lot less than 500 square metres in area. Cost $7,000. Status: Issued | 02 Apr 2013 | S72 Amendment to approved Planning Permit and/or Plans - Increase in height to carport from 2.45m to 3m. Status: Issued | 02 Apr 2013 | Amendment to approved Planning Permit and/or Plans | | 距離: 258 米 | 地圖位置 | 街景 |
|
| 11 Jul 2008 | Construction of a shed in a Special Building Overlay. Cost $5,000. Status: Issued | 29 Oct 2008 | S72 Amendment to approved Planning Permit and/or Plans. Status: Issued | 27 Jan 2009 | Construction of a front fence within a Special Building Overlay. Cost $8,000. Status: Issued | | 距離: 172 米 | 地圖位置 | 街景 |
|
| | |