Malvern 平均房價House 價格比去年下降3% . 周邊地區Armadale | $1,834,800 ![](/img/down.gif) | Caulfield North | $1,827,100 ![](/img/down.gif) | Glen Iris | $2,079,300 ![](/img/up.gif) | Hawthorn | $2,343,700 ![](/img/up.gif) | Hawthorn East | $2,266,400 ![](/img/up.gif) | Malvern East | $1,841,200 ![](/img/white.gif) | Toorak | $2,045,700 ![](/img/down.gif) | Malvern Median RentThe House rent is 上升9% .
| X"2/29 Parslow Street, Malvern" 附近的改建 |
| 23 Nov 2010 | Two (2) Lot Subdivision & Common Property - PS 644600 H. Status: Issued | 29 Feb 2012 | Secondary Consent Amendment to approved Plans - Extending width of Common Property area to ensure all meters/services located within,. Status: Issued | 29 Feb 2012 | Secondary Consent amendment with the following changes: - Extending width of Common Property area to ensure all meters/services located within, - Minor dimension changes as a result of as-constructed final survey. | | 距離: 82 米 | 地圖位置 | 街景 |
|
| 14 Dec 2010 | Construction of two dwellings on a lot in a Residential 1 Zone. Cost $950,000. Status: Issued | 21 Jul 2011 | Two (2) Lot Subdivision - PS 702228 F. Status: Issued | | 距離: 56 米 | 地圖位置 | 街景 |
|
| 01 Oct 2015 | Construction of two new dwellings on a lot. Cost $900,000 | 10 Mar 2017 | Two (2) Lot Subdivision | | 距離: 77 米 | 地圖位置 | 街景 |
|
| 16 Dec 2013 | Construction of two dwellings on a lot within a Residential 1 Zone. Cost $1,600,000. Status: NOD | 19 Jun 2015 | 2 lot subdivision | 23 Jun 2015 | Two lot subdivision - PS 741125 V | | 距離: 84 米 | 地圖位置 | 街景 |
|
| 29 May 2013 | Construction of two dwellings on a lot within a Residential 1 Zone. Cost $880,000. Status: NOD | 20 Mar 2015 | S72 Amendment to approved Planning Permit and/or Plans - Changes to approved plans. Cost $400,000 | 04 Sep 2018 | 2 lot building subdivision | | 距離: 77 米 | 地圖位置 | 街景 |
|
| 03 Dec 2008 | Alterations and additions to a dwelling on a lot less than 500m2. Cost $400,000. Status: Issued | | 距離: 85 米 | 地圖位置 | 街景 |
|
| 31 May 2012 | Construction of two dwellings on a lot within a Residential 1 Zone and a Special Building Overlay. Cost $1,000,000. Status: Issued | 03 Jul 2013 | Secondary Consent Amendment to approved Plans comprising window alterations. Status: Issued | 03 Jul 2013 | Amendment to approved Planning Permit and/or Plans - change of bench height. Window to study and bedroom 2. Window to rumpus and bedroom 1. | 19 Jul 2013 | Two (2) Lot Subdivision & Creation of Restriction - PS 721088 M. Status: Issued | 19 Jul 2013 | Two lot subdivision. | | 距離: 91 米 | 地圖位置 | 街景 |
|
| 22 Jul 2014 | Re-Subdivision of Lots 1 and 2 and Common Property in SP 28203 C creating Lots 1A and 2A - Section 32. Status: Issued | | 距離: 110 米 | 地圖位置 | 街景 |
|
| 22 Dec 2018 | Condition 1, 5, 9, 18 Landscape Plan Sustainability Design Assessment Tree Management Plan (Condition 9) Tree Management Plan (Condition 16 | | 距離: 125 米 | 地圖位置 | 街景 |
|
| 24 Jun 2014 | Construction of two dwellings on a lot within the General Residential Zone. Cost $2,000,000. Status: NOD | 29 Oct 2016 | Subdivision the land into two lots and Common Property in accordance with built form and Endorsed D more... | | 距離: 140 米 | 地圖位置 | 街景 |
|
| | |