Malvern 平均房價House 價格比去年下降3% . 周邊地區Armadale | $1,834,800 ![](/img/down.gif) | Caulfield North | $1,827,100 ![](/img/down.gif) | Glen Iris | $2,079,300 ![](/img/up.gif) | Hawthorn | $2,343,700 ![](/img/up.gif) | Hawthorn East | $2,266,400 ![](/img/up.gif) | Malvern East | $1,841,200 ![](/img/white.gif) | Toorak | $2,045,700 ![](/img/down.gif) | Malvern Median RentThe House rent is 上升9% .
| X"5/45 MILTON Parade, Malvern" 附近的改建 |
| 18 Jan 2010 | Alterations and additions to a dwelling on a lot less than 500 square metres in area. Cost $10,000. Status: Issued | | 距離: 3 米 | 地圖位置 | 街景 |
|
| 20 Sep 2007 | Construction of a dwelling on a lot less than 500sqm. Cost $200,000. Status: Issued | 10 Sep 2008 | Secondary Consent Amendment to approved Plans. Status: Issued | | 距離: 16 米 | 地圖位置 | 街景 |
|
| 27 Sep 2012 | Construction of two dwellings on a lot in a Residential 1 Zone. Cost $900,000. Status: Failure | 04 Oct 2013 | Construction of two dwellings on a lot in a Residential 1 Zone. Cost $950,000. Status: NOD | 30 Dec 2013 | Two (2) Lot Subdivision - PS 711333 H. Status: Issued | 24 Jul 2015 | Amendment to approved Planning Permit and/or Plans - addition of a swimming pool to each dwelling. Cost $7,500 | | 距離: 40 米 | 地圖位置 | 街景 |
|
| 09 Dec 2010 | Alterations and additions to a dwelling on a lot less than 500sqm. Cost $23,000. Status: Issued | | 距離: 72 米 | 地圖位置 | 街景 |
|
| 17 Jul 2007 | Part use of the site as storage and associated car parking dispensation. Cost $12,000. Status: Issued | | 距離: 50 米 | 地圖位置 | 街景 |
|
| 13 Feb 2009 | Part use of the site as storage and associated car parking reduction. Cost $8,600. Status: Issued | 24 Mar 2009 | Secondary Consent Amendment to approved Plans. Status: Issued | | 距離: 66 米 | 地圖位置 | 街景 |
|
| 26 Jul 2011 | Car parking dispensation associated with conversion of a parking space to a storage room for the existing office use. Cost $4,300. Status: Issued | | 距離: 62 米 | 地圖位置 | 街景 |
|
| 12 Aug 2008 | Multi-unit development within a Residential 1 Zone and a Special Building Overlay. Cost $1,300,000. Status: Failure | 28 Jun 2010 | Construction of a multi-unit development within a Residential 1 Zone and a Special Building Overlay. Cost $1,300,000. Status: NOD | | 距離: 86 米 | 地圖位置 | 街景 |
|
| 13 Mar 2014 | A reduction in the car parking requirements associated with use of the site as a medical centre (as of right) in a Commercial 1 Zone. Status: Issued | | 距離: 80 米 | 地圖位置 | 街景 |
|
| 03 Apr 2019 | PS 823140 U - 2 lot subdivision | | 距離: 77 米 | 地圖位置 | 街景 |
|
| | |