Port Melbourne 平均房價House 價格比去年下降6% . 周邊地區Port Melbourne Median RentThe House rent is 上升9% .
| X"166 Dow Street, Port Melbourne" 附近的改建 |
| 30 May 2013 | Three lot subdivision (PS425057A) SPEAR REF: S036120S | | 距離: 93 米 | 地圖位置 | 街景 |
|
| 21 Oct 2003 | Partial demolition of existing dwelling, and ground floor and first floor addition to the rear of the existing dwelling. | 18 Nov 2004 | Alterations and additions including installation of an air conditioner, construction of a new fence, construction of a storage shed, demolition of the front door and side panel and construction of a new front door and side panel. | 19 May 2006 | External painting of the existing dwelling | 24 May 2006 | Retrospective approval for the construction of a lean-to shed | 24 May 2006 | Installation of an air conditioning unit | 24 May 2006 | Construction of a front fence | 16 Jun 2006 | alterations to the existing dwelling comprising the replacement of the front door | 07 Mar 2008 | construction of decking to the porch of the existing dwelling | | 距離: 75 米 | 地圖位置 | 街景 |
|
| 06 Jul 1999 | Subdivision PS 429074 D | | 距離: 96 米 | 地圖位置 | 街景 |
|
| 24 Mar 2000 | 2 Lot subdivision | | 距離: 80 米 | 地圖位置 | 街景 |
|
| 31 Mar 2009 | Alterations and additions including partial demolition and two-storey rear addition to the existing building | | 距離: 102 米 | 地圖位置 | 街景 |
|
| 13 Jul 2010 | Construction of two, two-storey dwellings | 04 Oct 2012 | Subdivision of land into two (2) lots in accordance with the approved development permit. | 11 Oct 2012 | 2 lot subdivision of existing dwelling and shed PS712126H SPEAR REF NO: S028202C | 24 Mar 2015 | Relocation of first floor level toilet/powder room of each unit. | | 距離: 88 米 | 地圖位置 | 街景 |
|
| 08 Jan 2002 | Install two skylights | | 距離: 104 米 | 地圖位置 | 街景 |
|
| 03 Sep 2001 | Front and rear fence | | 距離: 82 米 | 地圖位置 | 街景 |
|
| 10 Dec 2001 | A single storey addition to the rear of the exisitng dwelling and painting externally. | 01 Mar 2002 | Paint exterior facade & fence, replace rear fence with colourbond rollerdoor, pave front verandah with sandstone pavers | | 距離: 83 米 | 地圖位置 | 街景 |
|
| 09 Jun 2021 | 1. Propose to re-clad the existing plywood cladding and corrugated cladding from the first floor to second floor of the existing townhouse due to maintenance issues. Client wishes to re-clad with new steel cladding: Archclad Cliptray 48. Refer attach | | 距離: 92 米 | 地圖位置 | 街景 |
|
| | |