Donvale 平均房價House 價格比去年上升3% . 周邊地區Blackburn North | $1,317,200 ![](/img/down.gif) | Doncaster East | $1,635,500 ![](/img/up.gif) | Mitcham | $1,190,300 ![](/img/up.gif) | Nunawading | $1,237,700 ![](/img/up.gif) | Park Orchards | $2,000,200 ![](/img/down.gif) | Ringwood | $1,015,300 ![](/img/white.gif) | Ringwood North | $1,306,600 ![](/img/up.gif) | Warrandyte | $1,605,100 ![](/img/down.gif) | Donvale Median RentThe House rent is 上升18% .
| X"13/205-213 MITCHAM Road, Donvale" 附近的改建 |
| 08 Aug 1994 | UNITS. Estimated Cost: $425000 | 24 May 1995 | UNITS. Estimated Cost: $350000 | 06 Mar 1996 | SUBDIVISION | 13 May 1998 | SUBDIVISION SUBDIVISION MULLUM | | 距離: 187 米 | 地圖位置 | 街景 |
|
| 16 Aug 1994 | UNITS. Estimated Cost: $230000 | 19 Nov 2009 | LAPSED Construction of two double storey dwellings and one single storey dwelling. Estimated Cost: $700000 | 30 Apr 2010 | Construction of two double storey dwellings and one single storey dwelling. Estimated Cost: $800000 | 27 Jul 2012 | Three (3) lot subdivision SPEAR S025600J | 25 Aug 2012 | Three Lot Subdivision | | 距離: 158 米 | 地圖位置 | 街景 |
|
| 30 Aug 1985 | FLATS | | 距離: 175 米 | 地圖位置 | 街景 |
|
| 10 Mar 2009 | Construction of a two-storey dwelling at the rear of the existing dwelling. Estimated Cost: $245000 | 05 Aug 2010 | Two lot subdivision. Estimated Cost: $0 | | 距離: 221 米 | 地圖位置 | 街景 |
|
| 21 Feb 2012 | Alterations and additions to the existing dwelling including a carport and the construction of a two-storey dwelling at the rear of the existing dwelling. Estimated Cost: $300000 | 29 May 2014 | 2 lot subdivision (SPEAR Application S052208C) | | 距離: 248 米 | 地圖位置 | 街景 |
|
| 16 May 1995 | DUAL OCCUPANCY. Estimated Cost: $160000 | 14 Nov 1995 | SUBDIVISION | | 距離: 181 米 | 地圖位置 | 街景 |
|
| 05 Jul 2019 | Construction of two, two storey dwellings | | 距離: 241 米 | 地圖位置 | 街景 |
|
| 01 Sep 1995 | EXTENSIONS. Estimated Cost: $120000 | 29 Dec 2010 | LAPSED Construction of a two-storey dwelling at the rear of the existing dwelling and alterations and additions to the existing dwelling. Estimated Cost: $400000 | 13 Jan 2012 | LAPSED Construction of a split level dwelling to the rear of the existing dwelling. Estimated Cost: $350000 | 23 Apr 2013 | Construction of two (2) storey dwelling to the rear of the existing dwelling and modifications to the existing dwelling. Estimated Cost: $350000 | 07 Dec 2015 | 2 Lot Subdivision (SPEAR S078034A) **VICSMART** | | 距離: 194 米 | 地圖位置 | 街景 |
|
| 07 Dec 2015 | 2 lot subdivision in accordance with attached plans | | 距離: 194 米 | 地圖位置 | 街景 |
|
| 05 Aug 2009 | Construction of two two-storey dwellings in a front and rear formation. Estimated Cost: $500000 | 03 Jul 2012 | 2 lot subdivision SPEAR APPLICATION S025159E | 25 Aug 2012 | Two houses are currently under construction | | 距離: 209 米 | 地圖位置 | 街景 |
|
| | |