Balwyn North 平均房價House 價格比去年下降3% . 周邊地區Balwyn | $2,465,600 | Bulleen | $1,474,900 | Doncaster | $1,480,100 | Ivanhoe | $1,587,000 | Ivanhoe East | $2,315,700 | Kew | $2,109,700 | Kew East | $1,887,000 | Mont Albert North | $1,666,800 | Balwyn North Median RentThe House rent is 上升12% .
| X"6A Ailsa Court, Balwyn North" 附近的改建 |
| 15 Jun 2007 | Construct two (2) dwellings on a lot. (NOD Delegated : 08/04/2008 by Delegated Authority) | 12 Nov 2009 | Subdivision of the land into two lots. (Permit Delegated : 31/12/2009 by Delegated Authority) | | 距離: 109 米 | 地圖位置 | 街景 |
|
| 19 Dec 2011 | Construction of a new dwelling partially located within a Special Building Overlay. (Permit Delegated : 29/12/2011 by Delegated Authority) | 04 Oct 2013 | Construct buildings and works in a Special Building Overlay (Permit Delegated : 21/10/2013 by Delegated Authority) | | 距離: 91 米 | 地圖位置 | 街景 |
|
| 02 Feb 2016 | Construction of a cross-over adjacent to a Category 1 Road Zone. | | 距離: 133 米 | 地圖位置 | 街景 |
|
| 31 Aug 2015 | Construction of two (2) dwellings on a lot. | | 距離: 115 米 | 地圖位置 | 街景 |
|
| 19 Nov 2013 | Construction of two dwellings on a lot and subdivision of the land. (Permit Delegated : 12/05/2014 by Delegated Authority) | 14 Jun 2018 | Construction of open and closing lourve roof associated with a dwelling on a lot less than 500 square metres | | 距離: 129 米 | 地圖位置 | 街景 |
|
| 21 Nov 2017 | Construction of two (2) dwellings on a lot in a Special Building Overlay (SBO). | | 距離: 120 米 | 地圖位置 | 街景 |
|
| 23 Aug 2016 | Use and development of the land for a medical centre and alteration of access to a road in a Road Zone Category 1 | | 距離: 166 米 | 地圖位置 | 街景 |
|
| 24 Nov 2016 | Construction of two (2) dwellings on a lot in a SBO | | 距離: 184 米 | 地圖位置 | 街景 |
|
| 31 Mar 2014 | Subdivide the land into six (6) lots. (NOD Delegated : 26/05/2014 by Delegated Authority) | | 距離: 139 米 | 地圖位置 | 街景 |
|
| 26 Nov 2013 | Construction of two dwellings on a lot. (NOD Delegated : 23/12/2014 by Delegated Authority) | 22 May 2015 | 2 lot land subdivision - currently single dwelling | 25 May 2015 | Subdivide the land into two (2) lots. | 30 Jul 2017 | Post RequestConstruction of two dwellings on a lot. | | 距離: 129 米 | 地圖位置 | 街景 |
|
| | |