Doncaster 平均房價House 價格比去年上升1% . 周邊地區Balwyn North | $2,303,900 | Blackburn North | $1,317,200 | Box Hill North | $1,357,500 | Bulleen | $1,419,500 | Doncaster East | $1,635,500 | Mont Albert North | $1,740,900 | Templestowe | $1,712,700 | Templestowe Lower | $1,364,700 | Doncaster Median RentThe House rent is 上升18% .
| X"1/17 Firth Street, Doncaster" 附近的改建 |
| 10 Dec 1991 | UNITS. Estimated Cost: $350000 | 17 Aug 1993 | SUBDIVISION | | 距離: 125 米 | 地圖位置 | 街景 |
|
| 08 Sep 1998 | MV SERV.CENTRE MV SERV.CENTRE KOONUNH | | 距離: 126 米 | 地圖位置 | 街景 |
|
| 27 Apr 1990 | TIMBER YARD. Estimated Cost: $50000 | 15 Jul 1994 | BLDGS & WORKS. Estimated Cost: $150000 | 29 Dec 1995 | WITHDRAWN PERIPHERAL SLS. Estimated Cost: $350000 | 29 Apr 1996 | BLDGS & WORKS. Estimated Cost: $95000 | 04 Feb 1998 | AUTO CENTRE AUTO CENTRE KOONUNG. Estimated Cost: $70000 | | 距離: 177 米 | 地圖位置 | 街景 |
|
| 26 Aug 1986 | ADVERT'G SIGN | 10 Aug 1993 | PERIPHERAL SLS | 16 Nov 1999 | CAFE. Estimated Cost: $25000 | 06 Dec 1999 | Motor Vehicle Sales and Storage | 27 Jan 2004 | Use and development of the land for Motor Vehicle Sales, variation to Clause 52.14 and associated signage. Estimated Cost: $80000 | 20 Oct 2008 | Buildings and works associated with the construction of a covered area at the rear of the site. Estimated Cost: $18000 | 23 Jul 2015 | Buildings and works associated with installation of a business identification sign. Estimated Cost: $59000 | | 距離: 190 米 | 地圖位置 | 街景 |
|
| 26 May 1998 | UNITS FOUR DOUBLE STOREY UNITS. Estimated Cost: $490000 | 30 Nov 1999 | SUBDIVISION | 23 Jan 2001 | Buildings and works associated with the erection of a satellite dish.. Estimated Cost: $110 | | 距離: 150 米 | 地圖位置 | 街景 |
|
| 04 Aug 1986 | MTR REPAIR STN | 27 Nov 1986 | MTR REPAIR STN | 27 Jan 1987 | ADVERT'G SIGN | 13 Jan 1988 | ADVERT'G SIGNS | 06 Apr 1988 | ADVERT'G SIGN | 12 May 1988 | The erection and Display of an illuminated sign panel to replace an existing sign panel on the land in accordance with the endorsed plan. | 26 Oct 1988 | ADVERT'G SIGN | 25 Jan 1990 | ADVERT'G SIGN. Estimated Cost: $4000 | 02 Jul 1990 | ADVERT'G SIGNS. Estimated Cost: $1400 | 20 Nov 1991 | ADVERT'G SIGN. Estimated Cost: $8500 | 09 Dec 1992 | ADVERT'G SIGN. Estimated Cost: $2500 | 04 Oct 1993 | ADVERT'G SIGN. Estimated Cost: $4500 | 04 Jul 1995 | ADVERT'G SIGN. Estimated Cost: $4990 | 07 Feb 2001 | MOTOR SALES ALTERATIONS AND USE FOR CAR SALES. Estimated Cost: $80000 | 26 Feb 2002 | SIGNAGE SIGNAGE FOR EXISTING CAR DEALERSHIP. Estimated Cost: $8000 | 08 Oct 2003 | Business identification signage and buildings and works associated with the erection of shade sails and minor building alterations. Estimated Cost: $30000 | 25 May 2016 | Buildings and works to the existing shop/office. Estimated Cost: $9500 | | 距離: 151 米 | 地圖位置 | 街景 |
|
| 09 Jun 1987 | BLDG ALTER'NS | 13 Jan 1988 | ADVERT'G SIGN | 22 Mar 1988 | ADVERT'G SIGN | 16 Nov 1990 | SPRAY PAINTING | 03 Dec 1992 | ADVERT'G SIGNS. Estimated Cost: $7500 | 17 Apr 1998 | SALES. Estimated Cost: $350000 | 22 Dec 1998 | SIGNS SIGNS PT LOTS 4-5 LP 3431 KOONUNG. Estimated Cost: $38000 | 28 May 2014 | Altered crossover to a road in Road Zone 1 (RDZ1) | | 距離: 220 米 | 地圖位置 | 街景 |
|
| 21 Nov 2014 | Construction of two, three-storey dwellings. Estimated Cost: $800000 | 27 Jun 2016 | 2 Lot Subdivision (SPEAR S08709S) **VICSMART** | | 距離: 188 米 | 地圖位置 | 街景 |
|
| 19 Apr 2016 | Construction of six, two-storey dwellings. Estimated Cost: $1904900 | 26 Feb 2018 | Amendment to Planning Permit PL16/026178 (issued for the construction of six dwellings (one, three-storey and five, two-storey)) by alterations including the removal of a full level of Dwelling 1 | | 距離: 144 米 | 地圖位置 | 街景 |
|
| 28 Oct 2013 | Buildings and works for the construction of a deck at the rear of the dwelling. Estimated Cost: $5000 | | 距離: 190 米 | 地圖位置 | 街景 |
|
| | |