Doncaster East 平均房價House 價格比去年上升10% . 周邊地區Blackburn North | $1,317,200 | Box Hill North | $1,357,500 | Doncaster | $1,474,300 | Donvale | $1,560,900 | Templestowe | $1,712,700 | Warrandyte | $1,605,100 | Doncaster East Median RentThe House rent is 上升13% .
| X"96 George Street, Doncaster East" 附近的改建 |
| 10 Apr 2015 | Construction of two, two-storey dwellings. Estimated Cost: $650000 | 14 Dec 2015 | Removal of Restrictive Covenant D348310 | | 距離: 40 米 | 地圖位置 | 街景 |
|
| 19 Sep 2005 | Demolition of building. Estimated Cost: $2000 | 15 Feb 2006 | LAPSED Development and use for the purpose of a childcare centre. Estimated Cost: $200000 | 12 May 2009 | Removal of four (4) exotic trees and sixteen (16) native trees, and remedial pruning of two (2) Cypress trees. | 09 Apr 2010 | Medical centre use (four practitioners), associated buildings and works (existing dwelling to be converted), a reduction of the on-site car parking requirement for the medical centre, the construction of two two-storey dwellings and the removal of on | 22 Dec 2010 | Two lot subdivision SPEAR S011159P. Estimated Cost: $0 | 05 Mar 2015 | Amendment to Planning Permit PL13/023391 (issued for the demolition of the rear extension to the existing heritage dwelling and removal of the Lemon Scented Gum tree, and construction of a new extension to the existing heritage dwelling, together wit | 06 Oct 2015 | Three (3) lot subdivision | 07 Oct 2015 | 3 Lot Subdivision SPEAR (S075032S) | | 距離: 62 米 | 地圖位置 | 街景 |
|
| 07 Oct 2013 | Construction of two, two-storey dwellings and the removal of vegetation and a front fence. Estimated Cost: $500000 | 02 Jun 2014 | 2 lot subdivision (SPEAR Application S052491E) | | 距離: 62 米 | 地圖位置 | 街景 |
|
| 06 Jul 1992 | DUAL OCCUPANCY. Estimated Cost: $50000 | | 距離: 97 米 | 地圖位置 | 街景 |
|
| 15 Jul 1988 | CONSULTING RMS | 07 Jun 1991 | ADVERT'G SIGNS. Estimated Cost: $600 | 02 Apr 2001 | WITHDRAWN Business Sign. Estimated Cost: $2117 | 01 Mar 2002 | Construction of two two-storey dwellings. Estimated Cost: $240000 | 15 Apr 2003 | Variation of covenant to allow two (2) dwellings of varying building materials. | 24 Sep 2003 | The erection of business identification signage. Estimated Cost: $1200 | | 距離: 90 米 | 地圖位置 | 街景 |
|
| 06 Aug 2018 | Construction of three, two-storey dwellings | | 距離: 90 米 | 地圖位置 | 街景 |
|
| 04 Jul 2005 | Construction of six two-storey dwellings and six lot subdivision. Estimated Cost: $1200000 | 04 Jul 2005 | Two lot subdivision | 28 Apr 2006 | WITHDRAWN Six lot subdivision | | 距離: 91 米 | 地圖位置 | 街景 |
|
| 07 Feb 2018 | Two (2) Lot Subdivision | | 距離: 103 米 | 地圖位置 | 街景 |
|
| 19 Aug 2022 | Construction of two, two-storey dwellings | | 距離: 105 米 | 地圖位置 | 街景 |
|
| 04 Nov 2015 | Construction of two, two-storey dwellings. Estimated Cost: $600000 | | 距離: 145 米 | 地圖位置 | 街景 |
|
| | |