Park Orchards 平均房價House 價格比去年下降6% . 周邊地區Park Orchards Median RentThe House rent is 上升23% .
| X"30 Granard Avenue, Park Orchards" 附近的改建 |
| 30 Oct 2012 | Buildings and works including vegetation removal associated with the construction of a garage within 5 metres of a side boundary. Estimated Cost: $20000 | | 距離: 162 米 | 地圖位置 | 街景 |
|
| 26 Nov 2008 | Vegetation removal comprising eleven (11) trees | 17 Sep 2009 | Buildings and works associated with the construction of a deck and pergola | | 距離: 274 米 | 地圖位置 | 街景 |
|
| 18 Feb 2004 | Construction of a swimming pool, pergola and gazebo and associated earthworks. Estimated Cost: $28000 | 17 Sep 2004 | Variation of the covenant contained in Instrument of Transfer No. 2478658 | | 距離: 180 米 | 地圖位置 | 街景 |
|
| 20 Aug 2008 | Removal of one (1) native tree and lopping of one (1) native tree | | 距離: 233 米 | 地圖位置 | 街景 |
|
| 03 Aug 2009 | Installation of an above-ground spa with associated decking and fencing, within the front setback.. Estimated Cost: $12900 | 21 Oct 2009 | Variation of Restrictive Covenant contained in Transfer No. A521145 related to ot 485 on LP11940 | | 距離: 195 米 | 地圖位置 | 街景 |
|
| 27 Aug 2003 | Vegetation Removal | 23 Mar 2011 | LAPSED Removal of one (1) native tree. Estimated Cost: $0 | 27 Sep 2012 | Buildings and works associated with the construction of alterations and additions to the existing dwelling and the removal of one (1) tree. Estimated Cost: $250000 | 18 Feb 2013 | Variation of the Restrictive Covenant contained in Transfer No 2552892 related to Lot 469 on Plan of Subdivision 11940 (827/864) to delete the wording "excavate carry away or remove or permit to be excavated carried away or removed any earth clay sto | | 距離: 224 米 | 地圖位置 | 街景 |
|
| 31 Oct 2001 | VEGE REMOVAL VEGETATION REMOVAL - 11 PINE TREES AND 1 NATIVE | 04 Jul 2012 | LAPSED Alterations and additions to the existing dwelling. Estimated Cost: $95000 | | 距離: 301 米 | 地圖位置 | 街景 |
|
| 28 Apr 2006 | LAPSED Vegetation removal | 08 Jun 2006 | Extension to existing dwelling, construction of a shed, and vegetation removal (one exotic and one native).. Estimated Cost: $120000 | 21 Aug 2006 | Variation of a restrictive covenant | | 距離: 201 米 | 地圖位置 | 街景 |
|
| 14 Sep 2010 | Lopping (pruning) of one (1) pine tree. Estimated Cost: $0 | | 距離: 263 米 | 地圖位置 | 街景 |
|
| 27 Oct 2004 | Additions to dwelling. Estimated Cost: $15000 | | 距離: 265 米 | 地圖位置 | 街景 |
|
| | |