Northbridge 平均房價House 價格比去年上升68% . 周邊地區Northbridge Median RentThe House rent is 上升6% .
| X"2/118 Sailors Bay Road, Northbridge" 附近的改建 |
| 17 Apr 2018 | Alterations and additions to an existing residential flat building including two new townhouses | | 距離: 4 米 | 地圖位置 | 街景 |
|
| 02 May 2014 | Change of use of two commercial units on ground floor to a residential unit and associated works. | | 距離: 22 米 | 地圖位置 | 街景 |
|
| 08 Aug 2013 | Change of use, alterations & additions to Commercial building and associated works. | | 距離: 28 米 | 地圖位置 | 街景 |
|
| 02 Mar 2012 | Demolish existing dwelling and construction of mixed use development - residential & commercial. | 24 Jul 2013 | New Commercial/industrial development, including demolition of existing structures and associated works. | | 距離: 34 米 | 地圖位置 | 街景 |
|
| 02 Aug 2017 | S96- Alterations to an existing strata unit to change the approved use from commercial to residential (change of plan to reflect -Urban Link Plan dated 28 June 2017) In reference to DA-1998/1188 for Unit 120A Sailors Bay Road, Northbridge | | 距離: 28 米 | 地圖位置 | 街景 |
|
| 26 Aug 2014 | Change of use of commercial tenancy into residential and associated works. | 04 Apr 2018 | Alterations to an existing strata unit to change the approved use from commercial to residential (In reference to DA-1998/1188 for Unit 120A Sailors Bay Road, Northbridge). | | 距離: 26 米 | 地圖位置 | 街景 |
|
| 18 Oct 2017 | Construction of a detached domed shade structure within the playground of the Northside Baptist Preschool. | | 距離: 39 米 | 地圖位置 | 街景 |
|
| 18 Jun 2014 | Proposed additional level of office space on an existing commercial building. | 20 Jun 2019 | Stage 1 - Installation of rainwater harvesting system associated with the approved additional level on top of the existing building. | | 距離: 46 米 | 地圖位置 | 街景 |
|
| 04 Jul 2014 | Demolish existing structures and construct a mixed-use residnetial and commercial building and strata subdivision of the completed development. | 05 Feb 2015 | Amend conditions 2 & condition 3G of development consent. | 05 Feb 2015 | Amend condition 3B and condition 32 and parking and stormwater plan | 08 Jun 2016 | Additional Floorspace in Commercial 1 17.4sqm and Associated Works. | | 距離: 39 米 | 地圖位置 | 街景 |
|
| 06 Aug 2018 | Alterations and additions to existing building. | | 距離: 44 米 | 地圖位置 | 街景 |
|
| | |