West Perth 平均房價House 價格比去年上升17% . 周邊地區Crawley | $1,199,100 ![](/img/white.gif) | Nedlands | $2,107,400 ![](/img/up.gif) | Northbridge | $1,077,500 ![](/img/up.gif) | Subiaco | $1,429,100 ![](/img/down.gif) | West Leederville | $1,390,800 ![](/img/up.gif) | West Perth Median RentThe House rent is 上升14% .
| X"19/1331 Hay Street, West Perth" 附近的改建 |
| 05 Mar 2014 | Section 40 - The Drinkwell Philosophy | | 距離: 123 米 | 地圖位置 | 街景 |
|
| 24 Jul 2015 | To replace the existing letterbox at the front of property | 17 Sep 2015 | Refurbishment of Basement End of Trip Facilities, Ground Floor Lobby/Toilets, First Floor Toilet Refurbishments, Second Floor Toilet Refurbishments & General Internal Make Good Works | | 距離: 149 米 | 地圖位置 | 街景 |
|
| 24 Nov 2016 | New signage | | 距離: 198 米 | 地圖位置 | 街景 |
|
| 29 Apr 2016 | Addition of Solar Panels to existing building | 09 Jun 2016 | Installation of Solar Panels on the Roof of an Existing Building. Cost: $54900 | | 距離: 172 米 | 地圖位置 | 街景 |
|
| 29 Jan 2016 | Installation of 4 x Cable Gates for Car Park | 05 May 2016 | Amendment - Installation of Two Boom Gates facing Ventnor Avenue and Two other Cable Gates | | 距離: 156 米 | 地圖位置 | 街景 |
|
| 09 Apr 2013 | Change of Use Level 3 from 'Residential' to 'Office' - Capital Assest Performance Management $0 | 15 Jul 2013 | Fitout - TAB | 30 Jun 2016 | Office Fitout to Level 1 - Doray Minerals | | 距離: 205 米 | 地圖位置 | 街景 |
|
| 07 Apr 2017 | Proposed roof terrace over existing roof structure, new roof over entry and internal fit out | | 距離: 190 米 | 地圖位置 | 街景 |
|
| 06 Sep 2013 | Office Renovation of Existing Fitout - Consolidated Minerals. Cost: $300000 | | 距離: 207 米 | 地圖位置 | 街景 |
|
| 27 Mar 2013 | Construction of Deck and Patio Cover Over Existing Containers | 19 Aug 2013 | Construction of Deck and Patio Cover Over Existing Containers. Cost: $15000 | | 距離: 189 米 | 地圖位置 | 街景 |
|
| 07 Mar 2014 | Section 40 - Gangemi's Fine Wines & Food | 19 Jun 2014 | Section 39 - Gangemi's | | 距離: 236 米 | 地圖位置 | 街景 |
|
| | |