Redbank Plains 平均房價House 價格比去年上升10% . 周邊地區Redbank Plains Median RentThe House rent is 上升8% .
| X"17 Chetwynd Street, Redbank Plains" 附近的改建 |
| 29 Mar 2019 | Combined Approval Reconfiguring a Lot - Two (2) Lots into Sixteen (16) Lots Material Change of Use - Single Residential (Building Envelope Plans) | | 距離: 154 米 | 地圖位置 | 街景 |
|
| 07 Jun 2012 | Roadworks, Drainage Works, Water Infrastructure & Sewerage Infrastructure - 1 lot into 17 lot subdivision | 27 Mar 2015 | Request to Extend Period of Approval | 14 May 2015 | Extension to a Relevant Period | | 距離: 257 米 | 地圖位置 | 街景 |
|
| 15 Sep 2015 | Road works, Stormwater, Water infrastructure, Drainage works, Sewerage infrastructure and Clearing vegetation under the planning scheme | 16 Nov 2015 | Permissible Change and Extension to a Relevant Period | 28 May 2017 | Two lots (2) into thirty (30) lots - Smart eDA | | 距離: 209 米 | 地圖位置 | 街景 |
|
| 17 Aug 2010 | Extension of Relevant Period | | 距離: 289 米 | 地圖位置 | 街景 |
|
| 20 Jun 2019 | Stormwater, Earthworks and Retaining Walls | | 距離: 385 米 | 地圖位置 | 街景 |
|
| 05 Sep 2016 | Dual Occupancy | | 距離: 365 米 | 地圖位置 | 街景 |
|
| 08 Jun 2017 | One (1) lot into three (3) lots | | 距離: 358 米 | 地圖位置 | 街景 |
|
| 20 Jun 2019 | Reconfigure a Lot - One (1) Lot into Three (3) Lots | | 距離: 440 米 | 地圖位置 | 街景 |
|
| 04 Jan 2016 | Two (2) lots into Thirty Three (33) lots | 06 Sep 2018 | Road Work, Stormwater, Water Infrastructure, Drainage Work, Earthworks, Sewage Infrastructure, Signage and Clearing Vegetation | | 距離: 403 米 | 地圖位置 | 街景 |
|
| 10 Mar 2019 | Material Change of Use - Dual Occupancy | | 距離: 430 米 | 地圖位置 | 街景 |
|
| | |