Drewvale 平均房價House 價格比去年上升19% . 周邊地區Drewvale Median RentThe House rent is 上升7% .
| X"41 Tweeddale Circuit, Drewvale" 附近的改建 |
| 05 Dec 2014 | Dwelling House | | 距離: 1 公里 | 地圖位置 | 街景 |
|
| 28 Jul 2015 | Build Over Sewer | | 距離: 1.1 公里 | 地圖位置 | 街景 |
|
| 24 May 2010 | Site Based Stormwater Quality Management Plan | 24 May 2010 | Filling and Excavation | 24 May 2010 | Roadworks and/or Drainage | 24 May 2010 | Erosion and Sediment Control | 15 Jun 2010 | Landscape Works on Private Land | 24 Jun 2010 | Multi-Unit Dwelling, Multi-Unit Dwelling, Multi-Unit Dwelling, Multi-Unit Dwelling, Multi-Unit Dwelling, Multi-Unit Dwelling, Multi-Unit Dwelling, Multi-Unit Dwelling, Multi-Unit Dwelling, Multi-Unit Dwelling | 25 Mar 2014 | Erosion and Sediment Control | 25 Mar 2014 | Filling and Excavation | 25 Mar 2014 | Roadworks and/or Drainage | 25 Mar 2014 | Site Based Stormwater Quality Management Plan | 18 Jun 2014 | Architectural Assessment | 14 Jul 2014 | Multi-Unit Dwelling, Multi-Unit Dwelling, Multi-Unit Dwelling, Multi-Unit Dwelling, Multi-Unit Dwelling, Multi-Unit Dwelling | 12 Sep 2018 | Erosion and Sediment Control | | 距離: 1.1 公里 | 地圖位置 | 街景 |
|
| 29 Dec 2010 | Landscape Works on Private Land | 17 May 2011 | Filling and Excavation | | 距離: 1.2 公里 | 地圖位置 | 街景 |
|
| 25 Dec 2016 | Subdivision of Land | | 距離: 1.2 公里 | 地圖位置 | 街景 |
|
| 20 May 2010 | House in a Waterway Corridor, House in EP/Rural Area | | 距離: 1.5 公里 | 地圖位置 | 街景 |
|
| 06 Apr 2011 | House in EP/Rural Area, House in EP/Rural Area | | 距離: 1.4 公里 | 地圖位置 | 街景 |
|
| 10 May 2012 | Centre Activity | 20 Jun 2013 | Erosion and Sediment Control | 21 Jun 2013 | Bulk Earthworks | 06 May 2014 | Centre Activity Within Centre, Centre Activity | 17 Apr 2015 | Traffic Functional Layout for Type A, B, or C Roads | 22 Apr 2015 | Roadworks and/or Drainage | 27 Apr 2015 | Construction Management Plans | 22 May 2015 | Signs and Line Marking for Type A, B or C Roads | 07 Jul 2015 | Landscape Works in Park | 17 Nov 2016 | Plan Sealing | | 距離: 1.4 公里 | 地圖位置 | 街景 |
|
| 17 May 2010 | Traffic Functional Layout for Type D Roads or Signalised Intersection | 25 Jun 2010 | Sewerage Reticulation | 28 Jun 2010 | Water Reticulation | 30 Jun 2010 | Bulk Earthworks | 30 Jun 2010 | Erosion and Sediment Control | 30 Jun 2010 | Roadworks and/or Drainage | | 距離: 2.2 公里 | 地圖位置 | 街景 |
|
| | |