Kuraby 平均房價House 價格比去年上升9% . 周邊地區Kuraby Median RentThe House rent is 上升16% .
| X"7 Tumut Close, Kuraby" 附近的改建 |
| 19 Aug 2010 | Cp620 reconfiguring a lot, cp615 structure plan | 19 Aug 2010 | Cp620 reconfiguring a lot, cp615 structure plan | 29 Oct 2012 | Landscape Works in Streetscape | 27 May 2015 | Landscape Works in Park | 12 Jun 2015 | Construction Management Plans | | 距離: 1.2 公里 | 地圖位置 | 街景 |
|
| 17 Mar 2015 | Subdivision of Land | 04 Aug 2015 | Road Works and/or Stormwater Drainage | 04 Aug 2015 | Filling and Excavation | 14 Dec 2017 | Subdivision of Land | | 距離: 1.1 公里 | 地圖位置 | 街景 |
|
| 06 Nov 2015 | Subdivision of Land | | 距離: 1.1 公里 | 地圖位置 | 街景 |
|
| 05 Mar 2014 | Subdivision of Land | 11 Feb 2016 | Subdivision of Land | | 距離: 1.1 公里 | 地圖位置 | 街景 |
|
| 28 Jun 2013 | Subdivision of Land | 29 Jul 2013 | Erosion and Sediment Control | 18 Sep 2013 | Plan Sealing | 08 Oct 2013 | Plan Sealing | | 距離: 1.1 公里 | 地圖位置 | 街景 |
|
| 22 Oct 2014 | Filling and Excavation | 22 Oct 2014 | Erosion and Sediment Control | 22 Oct 2014 | Traffic Functional Layout for Type A, B, or C Roads | 22 Oct 2014 | Signs and Line Marking for Type A, B or C Roads | 22 Oct 2014 | Roadworks and/or Drainage | 22 Oct 2014 | Filling and Excavation | 22 Oct 2014 | Traffic Functional Layout for Minor Roads | 22 Oct 2014 | Erosion and Sediment Control | 22 Oct 2014 | Signs and Line Marking for Minor Roads | 22 Oct 2014 | Road Works and/or Stormwater Drainage | 06 Feb 2015 | Subdivision of Land, Subdivision of Land | 07 Oct 2015 | Filling and Excavation | 07 Oct 2015 | Road Works and/or Stormwater Drainage | | 距離: 1.3 公里 | 地圖位置 | 街景 |
|
| 21 Sep 2015 | Dwelling House | | 距離: 1.4 公里 | 地圖位置 | 街景 |
|
| 14 Sep 2015 | Dwelling House, Dwelling House | | 距離: 1.4 公里 | 地圖位置 | 街景 |
|
| 06 May 2013 | Subdivision of Land | 06 May 2013 | Subdivision of Land, Access Easement | | 距離: 1.5 公里 | 地圖位置 | 街景 |
|
| 12 Aug 2010 | Build Over Sewer | | 距離: 1.2 公里 | 地圖位置 | 街景 |
|
| | |