Ningi 平均房價House 價格比去年上升9% . 周邊地區Ningi Median RentThe House rent is 上升23% .
| X"1390 Bribie Island Road, Ningi" 附近的改建 |
| 04 Sep 2015 | Operational Works for Sandstone Lakes, Stage 7, Roadworks, Drainage, Water, Sewer and Landscaping | 07 Sep 2016 | Operational Works for Sandstone Lakes, Stages 13A & 14A, Landscaping | | 距離: 1.1 公里 | 地圖位置 | 街景 |
|
| 07 Jun 2016 | Building Work - Preliminary Approval for an Outbuilding (Shade Structure) | | 距離: 1.5 公里 | 地圖位置 | 街景 |
|
| 25 Sep 2014 | Building Work - Preliminary Approval (Outbuilding - GFA and Overlay) | | 距離: 1.3 公里 | 地圖位置 | 街景 |
|
| 15 Jul 2014 | Building Work - Preliminary Approval (Outbuilding - GFA) | | 距離: 1.3 公里 | 地圖位置 | 街景 |
|
| 02 Feb 2016 | Shed (72m2) | | 距離: 1.5 公里 | 地圖位置 | 街景 |
|
| 15 May 2018 | Operational Works for Roadworks (description to be updated once DA Form 1 is received) | | 距離: 1.4 公里 | 地圖位置 | 街景 |
|
| 12 May 2011 | Building Work - Preliminary Approval (Outbuilding over GFA) | | 距離: 1.6 公里 | 地圖位置 | 街景 |
|
| 07 Oct 2015 | Material Change of Use for Dwelling House and Rural Worker's Dwelling (Overlays) | 07 Oct 2015 | Material Change of Use for Rural Worker's Dwelling (Overlays) | | 距離: 1.4 公里 | 地圖位置 | 街景 |
|
| 23 Feb 2018 | Minor change request | | 距離: 1.4 公里 | 地圖位置 | 街景 |
|
| 10 Aug 2016 | Operational Works for Stage 2, Electrical Reticulation | | 距離: 1.4 公里 | 地圖位置 | 街景 |
|
| | |